DAVE SCHNIDER - KITCHENER WARD 2 COUNCILLOR
  • Home
  • Council Meetings
    • Community & Infrastructure Committee
    • Finance & Corporate Services
    • Planning & Strategic Initiatives
  • About Ward 2
    • Community Centres
    • Ward 2 Parks
    • Ward 2 Schools
    • Ward 2 Places Of Worship
    • Community Clean Ups
    • Your Neighbourhood
    • Cycling & Trails
  • FAQ
  • Events/Festivals
  • Prospect Park
  • Quick Links
  • Neighbours Day
  • Bylaw Info
    • Backyard Fires
  • Traffic Calming
  • Affordable Housing
    • Housing Initiatives
  • About Dave
    • My Pledge
    • Dave At Events >
      • Event Pictures 2025
      • Event Pictures 2024
      • Event Pictures 2023
      • Event Pictures 2022
      • Event Pictures 2021
      • Event Pictures 2020
      • Event Pictures 2019
      • Event Pictures 2018
      • Event Pictures 2017
      • Event Pictures 2016
      • Event Pictures 2015
    • My Committees
  • Budget History
    • 2023 -26 STRATEGIC PLAN
    • Budget 2025
    • Budget 2024
    • Budget 2023
    • Budget 2022
    • BUDGET 2021
  • Who To Contact
  • Equity, Inclusion, Diversity, Anti-Racism
  • Kitchener In Bloom
  • Summer Camps
  • Coyote Information
  • City Of Kitchener Jobs
  • Pools and Splash Pads
  • Fireworks

​IDLE​WOOD GREENWAY STORMWATER & TRAIL IMPROVEMENTS
Kitchener is adding an underground stormwater storage facility to Idlewood Greenway.
It's part of of a large project to build climate change resilience and improve water quality in our creeks, 
This is planned for 2028 and gives us the opportunity to upgrade the  the trail section in the greenway area.
The images below show where the underground storage is proposed to be located.
It's between the trail entrances on Oldfield Drive and Chartwell Court.

And centred within Jadestone Crt, Dunnigton Crt, Drumoak Place & Darlington Place
Picture
WHEN COMPLETED IT WILL:
Reduce the risk of flooding
Improve water quality in Idlewood Creek & the Grand River
Reduce erosion in Idlewood Creek
Improve resilience against climate change
Enhance community safety

We will replace the existing trail network with a paved three-meter-wide asphalt trail.
This is part of the City’s commitment to making multi-use trails comfortable for all ages and abilities.
We will upgrade all trail entrances and add line painting, permanent and removable bollards, and signage

Learn more at engagewr.ca/idlewood-stormwater 

What Is An Underground Water Storage Facility?
Picture
Underground stormwater facilities store water in an underground tank system.
Stormwater enters the systems where sediment & debris are captured before being released to nearby creeks.
In some cases, water may be allowed to infiltrate into the ground where possible.
​Underground stormwater facilities are generally not visible from the surface. 
FREQUENTLY ASKED QUESTIONS
How big will the underground storage facility be? Where would it be in the greenway?
We have yet to confirm location within the park, size and design details. We will develop these details through the design process. We'll share design proposals with the public for review and comments at various stages. Plans may change considerably throughout the design process.  

Does an underground stormwater storage facility make noise? How is it maintained?
The facility will not make ongoing noise once installed. Maintenance with heavy equipment may occur every few years. We can confirm the maintenance schedule when we complete the stormwater facility designs.  

Will the underground stormwater storage facility affect groundwater levels or make my basement wet?
In Fall 2022 we conducted drilling at the greenway to assess the groundwater table and the soil conditions on site. Stormwater facility design will take into account current condition information. The stormwater facility will not negatively impact groundwater levels.

Will paths be returned to a natural habit rather than paved?
We will replace the existing trail network with a paved three-meter-wide asphalt trail. This is part of the City’s commitment to making multi-use trails comfortable for all ages and abilities. We will upgrade all trail entrances. We will add line painting, permanent and removable bollards, and signage.
​

Will maintenance of the stormwater facility be noisy?
The underground stormwater facility will not make noise once installed. It will likely need to be maintained using heavy equipment every few years. We can't confirm the maintenance schedule until the designs are finalized.
Picture


​                  FOLLOW ME ON SOCIAL MEDIA


​home page

  • Home
  • Council Meetings
    • Community & Infrastructure Committee
    • Finance & Corporate Services
    • Planning & Strategic Initiatives
  • About Ward 2
    • Community Centres
    • Ward 2 Parks
    • Ward 2 Schools
    • Ward 2 Places Of Worship
    • Community Clean Ups
    • Your Neighbourhood
    • Cycling & Trails
  • FAQ
  • Events/Festivals
  • Prospect Park
  • Quick Links
  • Neighbours Day
  • Bylaw Info
    • Backyard Fires
  • Traffic Calming
  • Affordable Housing
    • Housing Initiatives
  • About Dave
    • My Pledge
    • Dave At Events >
      • Event Pictures 2025
      • Event Pictures 2024
      • Event Pictures 2023
      • Event Pictures 2022
      • Event Pictures 2021
      • Event Pictures 2020
      • Event Pictures 2019
      • Event Pictures 2018
      • Event Pictures 2017
      • Event Pictures 2016
      • Event Pictures 2015
    • My Committees
  • Budget History
    • 2023 -26 STRATEGIC PLAN
    • Budget 2025
    • Budget 2024
    • Budget 2023
    • Budget 2022
    • BUDGET 2021
  • Who To Contact
  • Equity, Inclusion, Diversity, Anti-Racism
  • Kitchener In Bloom
  • Summer Camps
  • Coyote Information
  • City Of Kitchener Jobs
  • Pools and Splash Pads
  • Fireworks